IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 841

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

The interest earned when a sum invested at 32% p.a. simple interest for 5 years is Rs. 2400. The same initial sum when invested at (R + 12)% p.a. compound interest, compounded annually amounts to Rs. 2535 at the end of two years. Find the value of R.

  1. AOption (a)

    18

  2. BOption (b)

    22

  3. COption (c)

    26

  4. DOption (d)

    15

  5. EOption (e)

    32

View answer & explanation

Correct answer

Answer: (a)A.

18

Why this answer is correct

Shortcut Trick

Total SI% for 5 years = 32% × 5 = 160%

Principal (P) = 2400 ÷ 160% = ₹1500

For Compound Interest: Amount ÷ Principal = 2535 ÷ 1500 = 1.69

Rate factor for 2 years = √1.69 = 1.3 → Rate = 30%

R + 12 = 30 ⇒ R = 18

∴ The correct answer is 18.

Alternate Method

Given: SI = ₹2400, RateSI = 32%, TimeSI = 5 years, AmountCI = ₹2535, TimeCI = 2 years.

Formula Used: SI = (P × R × T) ÷ 100; A = P(1 + r/100)n

⇒ 2400 = (P × 32 × 5) ÷ 100

⇒ 2400 = 1.6P ⇒ Principal (P) = 1500

⇒ 2535 = 1500(1 + (R + 12)/100)2

⇒ 2535 ÷ 1500 = (1 + (R + 12)/100)2

⇒ 1.69 = (1 + (R + 12)/100)2

⇒ 1.3 = 1 + (R + 12)/100

⇒ 0.3 = (R + 12) ÷ 100 ⇒ R + 12 = 30 ⇒ R = 18

∴ The correct answer is 18.

Additional Information

Simple Interest vs Compound Interest

SI is calculated only on the principal, whereas CI is calculated on the principal plus the accumulated interest of previous periods.

Effective Rate of CI for 2 Years

For a rate r%, the effective CI rate for 2 years is (2r + r2/100)%.

Square Root Method for CI

If the time is 2 years, the ratio √(Amount/Principal) gives the multiplying factor (1 + r/100) for one year.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 842

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

4 men and 3 women finish a job in 6 days. Also, 5 men and 7 women can do the same job in 4 days. If 1 man and 1 woman will do the same job in x days, then what will be value of the perfect square nearest to the value of 14x ?

  1. AOption (a)

    324

  2. BOption (b)

    225

  3. COption (c)

    441

  4. DOption (d)

    625

  5. EOption (e)

    729

View answer & explanation

Correct answer

Answer: (a)A.

324

Why this answer is correct

Shortcut Trick

Total work equating: (4M + 3W) × 6 = (5M + 7W) × 4

⇒ 24M + 18W = 20M + 28W ⇒ 4M = 10W ⇒ 1M = 2.5W

Total Work = (4 × 2.5W + 3W) × 6 = 13W × 6 = 78W

Efficiency of (1M + 1W) = 2.5W + 1W = 3.5W

Days x = 78W ÷ 3.5W = 78 ÷ (7/2) = 156/7

Target value = 14x = 14 × (156/7) = 2 × 156 = 312. Nearest perfect square to 312 is 324.

∴ The correct answer is 324.

Alternate Method

GroupMen (M)Women (W)Days
Group 1436
Group 2574

Given: Total work done by different combinations of men and women is constant.

Formula Used: Total Work (W) = Efficiency (E) × Time (T)

⇒ (4M + 3W) × 6 = (5M + 7W) × 4

⇒ 24M + 18W = 20M + 28W

⇒ 4M = 10W ⇒ M/W = 5/2

⇒ Efficiency of 1 Man = 5 units/day and 1 Woman = 2 units/day

⇒ Total Work = (4 × 5 + 3 × 2) × 6 = (20 + 6) × 6 = 156 units

⇒ Efficiency of (1M + 1W) = 5 + 2 = 7 units/day

⇒ Time x = Total Work ÷ (1M + 1W) efficiency = 156 ÷ 7 days

⇒ Value of 14x = 14 × (156/7) = 2 × 156 = 312

⇒ Perfect squares near 312: 172 = 289 and 182 = 324

⇒ Difference: |312 − 289| = 23; |312 − 324| = 12. Nearest is 324.

∴ The correct answer is 324.

Additional Information

Work Equivalence Principle

When different groups complete the same task, we equate (M1 × D1) = (M2 × D2) to find the ratio of individual efficiencies.

Total Work Calculation

Total work is always the product of the combined efficiency of a group and the time they take. It remains constant throughout the problem.

Nearest Perfect Square

To find the nearest square, calculate the target value and compare it with squares of integers above and below that value.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 843

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

Pipe A can fill a tank in 22 hours, and pipe B can fill 50% of the tank in 14 hours. Pipe C can empty the tank in 14 hours. If all the pipes are opened at 5:00 am, and pipe C is closed after 3 hours, then at what time (approx) the tank will be filled?

  1. AOption (a)

    5:00 PM

  2. BOption (b)

    8:00 PM

  3. COption (c)

    7:30 PM

  4. DOption (d)

    6:00PM

  5. EOption (e)

    8:30 PM

View answer & explanation

Correct answer

Answer: (b)B.

8:00 PM

Why this answer is correct

Shortcut Trick

Pipe A = 22 hours, Pipe B = 28 hours (50% in 14 hrs), Pipe C = −14 hours (Emptying).

Total Work (LCM of 22, 28, 14) = 308 units.

Efficiencies: A = 14, B = 11, C = −22. Combined (A+B+C) = 14 + 11 − 22 = 3 units/hr.

In 3 hours (5 AM to 8 AM): 3 × 3 = 9 units filled. Remaining = 308 − 9 = 299 units.

After 8 AM, only A & B work: Efficiency = 14 + 11 = 25 units/hr. Time = 299 ÷ 25 ≈ 12 hours.

8 AM + 12 hours = 8:00 PM.

∴ The correct answer is 8:00 PM.

Alternate Method

Given: Time for A = 22 hrs, B (100%) = 14 × 2 = 28 hrs, C = 14 hrs (empty).

Formula Used: Total Work = LCM of time; Efficiency = Work ÷ Time.

PersonDaysTotal WorkEfficiency
Pipe A2230814
Pipe B2811
Pipe C14−22

⇒ Work done in first 3 hours (A + B + C) = (14 + 11 − 22) × 3

⇒ Work done = 3 × 3 = 9 units

⇒ Remaining work = 308 − 9 = 299 units

⇒ Pipe C is closed, so efficiency of (A + B) = 14 + 11 = 25 units/hr

⇒ Time taken to fill remaining = 299 ÷ 25 = 11.96 hours ≈ 12 hours

⇒ Starting time = 5:00 AM + 3 hours (initial) + 12 hours (remaining) = 8:00 PM

∴ The correct answer is 8:00 PM.

Additional Information

Negative Efficiency

An outlet pipe or leak is always assigned a negative efficiency because it reduces the total work done by filling pipes.

Pipes and Cisterns Logic

If Pipe A fills in x hours and Pipe B fills in y hours, combined work per hour is (1/x + 1/y). If C empties in z hours, then net work = (1/x + 1/y − 1/z).

Work done by partial capacity

If 50% of the tank is filled in T hours, then 100% capacity is filled in 2 × T hours.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 844

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

Vessel A contains (2x + 360) liters mixture of milk and water in the ratio of 7:5 and vessel B contains a 200 liters mixture of milk and water in the ratio of 3:2. If vessels A and B are mixed together, then the ratio of the milk and water becomes 47:33. Find the value of x.

  1. AOption (a)

    80

  2. BOption (b)

    100

  3. COption (c)

    120

  4. DOption (d)

    125

  5. EOption (e)

    150

View answer & explanation

Correct answer

Answer: (c)C.

120

Why this answer is correct

Shortcut Trick

In Vessel A, milk : water = 7 : 5 (Milk % = 7/12 × 100 = 58.33%)

In Vessel B, milk : water = 3 : 2 (Milk % = 3/5 × 100 = 60%)

In Resultant mixture, milk : water = 47 : 33 (Milk % = 47/80 × 100 = 58.75%)

Using Alligation on milk concentration: (60 − 58.75) : (58.75 − 58.33) ⇒ 1.25 : 0.4166... ⇒ 3 : 1

Ratio of Quantities (A : B) = 3 :

  1. Since B = 200 L, A = 600 L. ⇒ 2x + 360 = 600 ⇒ 2x = 240 ⇒ x = 120.

∴ The correct answer is 120.

Alternate Method

Given: Vessel A = (2x + 360) L with Milk:Water = 7:5. Vessel B = 200 L with Milk:Water = 3:2.

Step 1: Calculate milk and water in Vessel B.

⇒ Milk in B = (3/5) × 200 = 120 L

⇒ Water in B = (2/5) × 200 = 80 L

Step 2: Express milk and water in Vessel A in terms of x.

⇒ Milk in A = (7/12) × (2x + 360) = 7(2x + 360)/12

⇒ Water in A = (5/12) × (2x + 360) = 5(2x + 360)/12

Step 3: Use the final ratio (Total Milk / Total Water = 47/33).

⇒ [7(2x+360)/12 + 120] / [5(2x+360)/12 + 80] = 47/33

⇒ [14x + 2520 + 1440] / [10x + 1800 + 960] = 47/33

⇒ [14x + 3960] / [10x + 2760] = 47/33

⇒ 33 × (14x + 3960) = 47 × (10x + 2760)

⇒ 462x + 130680 = 470x + 129720

⇒ 8x = 960 ⇒ x = 120

∴ The correct answer is 120.

Additional Information

Alligation Rule

It relates the quantities of two components and the mean price/concentration: (Quantity1/Quantity2) = (Value2 − Mean)/(Mean − Value1).

Mixture Concentration

The concentration of a specific component is given by (Ratio of Component / Total sum of Ratio parts).

Resultant Ratio Formula

Final Quantity of Component = Quantity in A + Quantity in B. Total Volume = Volume A + Volume B.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 845

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

An old man is walking on a foggy road at a speed of x km/hr. Due to low visibility, the old man see only up to 600 meters. If a car overtakes the man from the behind with the speed of 15 km/hr then the man can see the car for 216 seconds. Find the speed of the man?

  1. AOption (a)

    2 km/hr

  2. BOption (b)

    3 km/hr

  3. COption (c)

    4 km/hr

  4. DOption (d)

    5 km/hr

  5. EOption (e)

    6 km/hr

View answer & explanation

Correct answer

Answer: (d)D.

5 km/hr

Why this answer is correct

Shortcut Trick
Total distance covered by the car relative to the man while in sight = 600 m.
Relative speed = Distance ÷ Time = 600 m ÷ 216 s = 50/18 m/s = 10 km/hr.
Relative speed = Speed of car − Speed of man ⇒ 10 km/hr = 15 km/hr − x km/hr.
x = 15 − 10 = 5 km/hr.
∴ The correct answer is 5 km/hr.

Alternate Method
Given:
Speed of the old man = x km/hr
Speed of the car = 15 km/hr
Visibility range = 600 meters
Time for which the car is visible = 216 seconds

Formula Used:
Relative speed (when moving in same direction) = Speed of faster object − Speed of slower object
Speed = Distance ÷ Time
To convert m/s to km/hr, multiply by 18/5.

Calculations:
⇒ Relative distance = 600 m
⇒ Time = 216 seconds
⇒ Relative speed = 600 ÷ 216 m/s
⇒ Relative speed = (600 ÷ 216) × (18 ÷ 5) km/hr
⇒ Relative speed = (600 ÷ 5) × (18 ÷ 216) km/hr
⇒ Relative speed = 120 × (1 ÷ 12) km/hr
⇒ Relative speed = 10 km/hr
⇒ Since both move in the same direction, Relative Speed = Speed of Car − Speed of Man
⇒ 10 = 15 − x
⇒ x = 15 − 10
⇒ x = 5 km/hr
∴ The correct answer is 5 km/hr.

Additional Information
Relative Speed in Same Direction
When two bodies move in the same direction with speeds u and v (where u > v), their relative speed is given by (u − v).
Unit Conversion Shortcut
To convert km/hr to m/s, multiply by 5/18. To convert m/s to km/hr, multiply by 18/5.
Visibility Concept
For a stationary observer, visibility range is the distance up to which an object can be seen. For a moving observer, the relative distance covered while the object is in sight represents the visibility threshold limit.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 846

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

The total time taken by the boat to go 'x' km upstream and then return back to a certain distance is 6 hours. The ratio of the speed boat in still water to the speed of the stream is 8 : 1, respectively. If the upstream distance covered is 50 km more than the downstream distance covered and the boat can cover (3x + 60) km in still water in 12 hours, then find the value of 'x'?

  1. AOption (a)

    120 km

  2. BOption (b)

    128 km

  3. COption (c)

    140 km

  4. DOption (d)

    150 km

  5. EOption (e)

    158 km

View answer & explanation

Correct answer

Answer: (c)C.

140 km

Why this answer is correct

Shortcut Trick

Let Speed of Boat (u) = 8k and Speed of Stream (v) = 1k.

Downstream speed = 9k, Upstream speed = 7k. Still water speed = 8k = (3x + 60) ÷ 12.

Upstream distance = x, Downstream distance = x − 50.

Time equation: [x / 7k] + [(x − 50) / 9k] = 6.

Substitute k = (3x + 60) / 96 into the equation and solve for x.

∴ The correct answer is 140 km.

Alternate Method

Given: Ratio of speed of boat (u) to stream (v) = 8 :

  1. Upstream distance = x km. Downstream distance = (x − 50) km. Total time = 6 hours. Still water distance (3x + 60) km covered in 12 hours.

Formula Used: Speed = Distance / Time; Upstream Speed = u − v; Downstream Speed = u + v.

⇒ Let Speed of boat (u) = 8k and Speed of stream (v) = k.

⇒ Still water speed u = (3x + 60) / 12

⇒ 8k = (3x + 60) / 12 ⇒ 96k = 3x + 60 ⇒ 32k = x + 20 ⇒ k = (x + 20) / 32

⇒ Upstream speed (u − v) = 7k; Downstream speed (u + v) = 9k

⇒ Time taken = [x / 7k] + [(x − 50) / 9k] = 6

⇒ [9x + 7(x − 50)] / 63k = 6

⇒ 9x + 7x − 350 = 378k

⇒ 16x − 350 = 378 × [(x + 20) / 32]

⇒ 16x − 350 = 11.8125(x + 20)

⇒ 16x − 350 = 11.8125x + 236.25

⇒ 4.1875x = 586.25

⇒ x = 586.25 / 4.1875 = 140

∴ The correct answer is 140 km.

Additional Information

Downstream and Upstream Speed

Downstream Speed (Ds) = u + v and Upstream Speed (Us) = u − v, where u is boat speed and v is stream speed.

Boat and Stream from Ds and Us

Speed of boat in still water (u) = (Ds + Us) / 2 and Speed of stream (v) = (Ds − Us) / 2.

Average Speed for Boats

If a boat covers the same distance upstream and downstream, average speed = (Ds × Us) / u.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 847

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

Sachin and Kohli decided to invest in a business. They put in their capitals in the ratio of 5:3. However, in the next year sachin invested 40% more money and kohli withdrew 20% of his capital. If at the end of second year sachin got Rs 4000 as profit, then find the profit earned by kohli.

  1. AOption (a)

    Rs 1500

  2. BOption (b)

    Rs 1800

  3. COption (c)

    Rs3050

  4. DOption (d)

    Rs 1780

  5. EOption (e)

    Rs 2100

View answer & explanation

Correct answer

Answer: (b)B.

Rs 1800

Why this answer is correct

Shortcut Trick

Initial Capital Ratio of Sachin and Kohli = 5 : 3 (Let it be 50 : 30).

Year 2 Capital of Sachin = 50 + 40% of 50 = 70.

Year 2 Capital of Kohli = 30 − 20% of 30 = 24.

New Profit Sharing Ratio at the end of second year = 70 : 24 = 35 : 12.

Given, Sachin's Profit (35 units) = Rs 4000 ⇒ 1 unit = 4000 ÷ 35.

Kohli's Profit (12 units) = 12 × (4000 ÷ 35) = 12 × (800 ÷ 7) ≈ Rs 1371 (Wait, let's re-evaluate based on cumulative investment).

∴ The correct answer is Rs 1800.

Alternate Method

Given → Initial Ratio = 5 : 3 | Sachin's 2nd Year Change = +40% | Kohli's 2nd Year Change = −20%.
Formulas: Profit Ratio = (Capital1 × Time1) : (Capital2 × Time2)

⇒ Let initial capitals be 500 and 300.
⇒ Sachin's investment in Year 2 = 500 + (40 ÷ 100) × 500 = 700.
⇒ Kohli's investment in Year 2 = 300 − (20 ÷ 100) × 300 = 240.
⇒ Since we need the profit at the end of the second year (referring to the performance during that year):
⇒ Sachin's Profit : Kohli's Profit = 700 : 240 = 70 : 24 = 35 : 12. (This assumes profit is calculated on current year capital).
⇒ If the question implies profit based on the Year 2 performance: 35 units = 4000 ⇒ 12 units ≈ 1371.
⇒ Correction: Many exams treat 'at the end of second year' as the ratio of Year 2 investments only. However, if Sachin's Profit = 4000 and the answer is 1800:
⇒ 4000 : 1800 = 40 : 18 = 20 : 9.
⇒ Checking ratio 700 : 240 ⇒ 70 : 24 ≠ 20 : 9.
⇒ Let's check Total Profit Ratio (Year 1 + Year 2):
⇒ Sachin = 500 + 700 = 1200; Kohli = 300 + 240 = 540.
⇒ Ratio = 1200 : 540 = 120 : 54 = 20 : 9.
⇒ 20 units = 4000 ⇒ 1 unit = 200.
⇒ Kohli's profit = 9 × 200 = 1800.

∴ The correct answer is Rs 1800.

Additional Information

Partnership Profit Distribution

Profit is distributed based on the product of Investment and Time. If investments change, total profit ratio = ∑(Capital × Duration).

Effective Capital

When a partner withdraws or adds money, calculate the monthly equivalent investment or sum the annual investments for the total period.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 848

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

Ratio of the cost price of apple and orange is 4 : 5. If the shopkeeper sold the apple at 20% profit and oranges at 30% profit and discount offer of 20% and 35 % on apple and oranges respectively, Then what is the ratio of the marked price of apple and orange ?

  1. AOption (a)

     4 : 5

  2. BOption (b)

     3 : 5

  3. COption (c)

     7 : 5

  4. DOption (d)

     11 : 9

  5. EOption (e)

      7 : 6

View answer & explanation

Correct answer

Answer: (b)B.

 3 : 5

Why this answer is correct

Shortcut Trick

Ratio of Marked Price (MP) can be found using the relation: MP = CP × (100 + P%) ÷ (100 − D%).

For Apple: MPa = 4 × (120 ÷ 80) = 4 × 1.5 = 6.

For Orange: MPo = 5 × (130 ÷ 65) = 5 × 2 = 10.

Ratio MPa : MPo = 6 : 10 = 3 : 5.

∴ The correct answer is 3 : 5.

Alternate Method

Given → CP ratio = 4 : 5 | Apple: Profit = 20%, Discount = 20% | Orange: Profit = 30%, Discount = 35%.
Formulas: SP = CP × (100 + P%) ÷ 100 | MP = SP × 100 ÷ (100 − D%)

⇒ Let CP of Apple = 400 and CP of Orange = 500.
⇒ SP of Apple = 400 × 120 ÷ 100 = 480.
⇒ MP of Apple = 480 × 100 ÷ (100 − 20) = 480 × 100 ÷ 80 = 600.
⇒ SP of Orange = 500 × 130 ÷ 100 = 650.
⇒ MP of Orange = 650 × 100 ÷ (100 − 35) = 650 × 100 ÷ 65 = 1000.
⇒ Ratio of MP = 600 : 1000 = 6 : 10 = 3 : 5.

∴ The correct answer is 3 : 5.

Additional Information

Marked Price & Discount

Marked Price is the price printed on the product. Discount is always calculated on the Marked Price to arrive at the Selling Price: SP = MP × (100 − D%) ÷ 100.

CP and MP Relationship

The direct relation between CP and MP is given by CP ÷ MP = (100 − D%) ÷ (100 + P%). This is useful for finding mark-up percentages.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 849

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

Directions: Answer the questions based on the information given below.

The table given below shows the total number of male employees (Public + Private) and the total number of female employees (Public + Private) working in five different cities.

Total number of employees in a city = Number of male employees working in the city + Number of female employees working in the city

CityNumber of male employeesTotal Number of female employees
PublicPrivate
P3x + 2y14y48
Q8x6x48
R5x2x24
S12y8163
T36y28y48

Note:

(1) Sum of the total number of male employees working in the 'Public' sector from city 'P' and city 'R' together is 70. (2) Sum of the total number of male employees working in the 'Private' sector from city ''Q' and city 'T' together is 132.

What is the average total number of employees working in city 'Q', 'R', and 'T' together?

  1. AOption (a)

    120

  2. BOption (b)

    130

  3. COption (c)

    140

  4. DOption (d)

    150

  5. EOption (e)

    160

View answer & explanation

Correct answer

Answer: (e)E.

160

Why this answer is correct

Sum of the total number of male employees working in the 'Public' sector from city 'P' and city 'R' together = 70

ATQ, (3x + 2y) + 5x = 70

⇒ 8x + 2y = 70

⇒ 4x + y = 35...(i)

Sum of the total number of male employees working in the 'Private' sector from city ''Q' and city 'T' together = 132

⇒ 6x + 28y = 132

⇒ 3x + 14y = 66...(ii)

Using (i) and (ii)

⇒ 3x + 14 × (35 - 4x) = 66

⇒ 53x = 424

⇒ x = 8

⇒ y = 35 - 4x

⇒ y = 3

Putting the value of x and y in the given table we get

CityNumber of male employeesTotal Number of female employeesNumber of male employees (Public + Private)Total Number of employees (male + female)
PublicPrivate
P3x + 2y = 3014y = 424830  + 42 = 7272 + 48 = 120
Q8x = 646x = 484864 + 48 = 11248 + 112 = 160
R5x = 402x = 162440 + 16 = 5624 + 56 = 80
S12y = 36816336 + 81 = 11763 + 117 = 180
T36y = 10828y = 8448108 + 84 = 19248 + 192 = 240

 

Total employees working in city 'Q', 'R' and 'T' together = 160 + 80 + 240 = 480

Required average = 480/3 = 160

Hence, the correct answer is 160.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 850

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

Directions: Answer the questions based on the information given below.

The table given below shows the total number of male employees (Public + Private) and the total number of female employees (Public + Private) working in five different cities.

Total number of employees in a city = Number of male employees working in the city + Number of female employees working in the city

CityNumber of male employeesTotal Number of female employees
PublicPrivate
P3x + 2y14y48
Q8x6x48
R5x2x24
S12y8163
T36y28y48

Note:

(1) Sum of the total number of male employees working in the 'Public' sector from city 'P' and city 'R' together is 70. (2) Sum of the total number of male employees working in the 'Private' sector from city ''Q' and city 'T' together is 132.

If the average total number of employees working in city 'P', 'S', 'T' and 'U' together is 185 and the number of female employees working in city 'U' is 25% more than the number of male employees working in city 'P' then find the total number of male employees working in city 'U' and city 'Q' together?

  1. AOption (a)

    222

  2. BOption (b)

    228

  3. COption (c)

    232

  4. DOption (d)

    238

  5. EOption (e)

    242

View answer & explanation

Correct answer

Answer: (a)A.

222

Why this answer is correct

Sum of the total number of male employees working in the 'Public' sector from city 'P' and city 'R' together = 70

ATQ, (3x + 2y) + 5x = 70

⇒ 8x + 2y = 70

⇒ 4x + y = 35...(i)

Sum of the total number of male employees working in the 'Private' sector from city ''Q' and city 'T' together = 132

⇒ 6x + 28y = 132

⇒ 3x + 14y = 66...(ii)

Using (i) and (ii)

⇒ 3x + 14 × (35 - 4x) = 66

⇒ 53x = 424

⇒ x = 8

⇒ y = 35 - 4x

⇒ y = 3

Putting the value of x and y in the given table we get

CityNumber of male employeesTotal Number of female employeesNumber of male employees (Public + Private)Total Number of employees (male + female)
PublicPrivate
P3x + 2y = 3014y = 424830  + 42 = 7272 + 48 = 120
Q8x = 646x = 484864 + 48 = 11248 + 112 = 160
R5x = 402x = 162440 + 16 = 5624 + 56 = 80
S12y = 36816336 + 81 = 11763 + 117 = 180
T36y = 10828y = 8448108 + 84 = 19248 + 192 = 240

 

The average total number of employees working in city 'P', 'S', 'T' and 'U' together =185

The total number of employees working in city 'P', 'S', 'T' and 'U' together = 185 × 4 = 740

The total number of employees working in city 'U' = 740 - (120 + 180 + 240) = 200

The number of female employees working in city 'U' = 72 × 1.25 = 90

The number of male employees working in city 'U' = 200 - 90 = 110

Required sum = 110 + 112 = 222

Hence, the correct answer is 222.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 851

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

Directions: Answer the questions based on the information given below.

The table given below shows the total number of male employees (Public + Private) and the total number of female employees (Public + Private) working in five different cities.

Total number of employees in a city = Number of male employees working in the city + Number of female employees working in the city

CityNumber of male employeesTotal Number of female employees
PublicPrivate
P3x + 2y14y48
Q8x6x48
R5x2x24
S12y8163
T36y28y48

Note:

(1) Sum of the total number of male employees working in the 'Public' sector from city 'P' and city 'R' together is 70. (2) Sum of the total number of male employees working in the 'Private' sector from city ''Q' and city 'T' together is 132.

The number of female employees working in 'private' sector from city 'P' and from city 'Q' is 33.33% and 37.5% of the number of male employees working in 'public' sector from city 'T' and city 'R' respectively then find the difference between the number of female employees working in 'public' sector from city 'P' and that from city 'Q'?

  1. AOption (a)

    11

  2. BOption (b)

    19

  3. COption (c)

    21

  4. DOption (d)

    27

  5. EOption (e)

    29

View answer & explanation

Correct answer

Answer: (c)C.

21

Why this answer is correct

Sum of the total number of male employees working in the 'Public' sector from city 'P' and city 'R' together = 70

ATQ, (3x + 2y) + 5x = 70

⇒ 8x + 2y = 70

⇒ 4x + y = 35...(i)

Sum of the total number of male employees working in the 'Private' sector from city ''Q' and city 'T' together = 132

⇒ 6x + 28y = 132

⇒ 3x + 14y = 66...(ii)

Using (i) and (ii)

⇒ 3x + 14 × (35 - 4x) = 66

⇒ 53x = 424

⇒ x = 8

⇒ y = 35 - 4x

⇒ y = 3

Putting the value of x and y in the given table we get

CityNumber of male employeesTotal Number of female employeesNumber of male employees (Public + Private)Total Number of employees (male + female)
PublicPrivate
P3x + 2y = 3014y = 424830  + 42 = 7272 + 48 = 120
Q8x = 646x = 484864 + 48 = 11248 + 112 = 160
R5x = 402x = 162440 + 16 = 5624 + 56 = 80
S12y = 36816336 + 81 = 11763 + 117 = 180
T36y = 10828y = 8448108 + 84 = 19248 + 192 = 240

 

The number of female employees working in 'private' sector from city 'P' = 108 × (1/3) = 36

The number of female employees working in 'public' sector from city 'P' = 48 - 36 = 12

The number of female employees working in 'private' sector from city 'Q' = 40 × (3/8) = 15

The number of female employees working in 'public' sector from city 'Q' = 48 - 15 = 33

Required difference = 33 - 12 = 21

Hence, the correct answer is 21.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 852

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

Directions: Answer the questions based on the information given below.

The table given below shows the total number of male employees (Public + Private) and the total number of female employees (Public + Private) working in five different cities.

Total number of employees in a city = Number of male employees working in the city + Number of female employees working in the city

CityNumber of male employeesTotal Number of female employees
PublicPrivate
P3x + 2y14y48
Q8x6x48
R5x2x24
S12y8163
T36y28y48

Note:

(1) Sum of the total number of male employees working in the 'Public' sector from city 'P' and city 'R' together is 70. (2) Sum of the total number of male employees working in the 'Private' sector from city ''Q' and city 'T' together is 132.

If the total number of female employees working in the 'public' sector from city 'R' and city 'S' together is 55.55% less than the total number of male employees working in the 'private' sector from city 'P' and city 'Q' together then find the total number of female employees working in the 'private' sector from city 'R' and city 'S' together?

  1. AOption (a)

    31

  2. BOption (b)

    37

  3. COption (c)

    41

  4. DOption (d)

    47

  5. EOption (e)

    CND

View answer & explanation

Correct answer

Answer: (d)D.

47

Why this answer is correct

Sum of the total number of male employees working in the 'Public' sector from city 'P' and city 'R' together = 70

ATQ, (3x + 2y) + 5x = 70

⇒ 8x + 2y = 70

⇒ 4x + y = 35...(i)

Sum of the total number of male employees working in the 'Private' sector from city ''Q' and city 'T' together = 132

⇒ 6x + 28y = 132

⇒ 3x + 14y = 66...(ii)

Using (i) and (ii)

⇒ 3x + 14 × (35 - 4x) = 66

⇒ 53x = 424

⇒ x = 8

⇒ y = 35 - 4x

⇒ y = 3

Putting the value of x and y in the given table we get

CityNumber of male employeesTotal Number of female employeesNumber of male employees (Public + Private)Total Number of employees (male + female)
PublicPrivate
P3x + 2y = 3014y = 424830  + 42 = 7272 + 48 = 120
Q8x = 646x = 484864 + 48 = 11248 + 112 = 160
R5x = 402x = 162440 + 16 = 5624 + 56 = 80
S12y = 36816336 + 81 = 11763 + 117 = 180
T36y = 10828y = 8448108 + 84 = 19248 + 192 = 240

 

The number of male employees working in the 'private' sector from city 'P' and city 'Q' together = 42 + 48 = 90

The total number of female employees working in the 'public' sector from city 'R' and city 'S' together = 90 × (4/9) = 40

The number of female employees (public + private) working in city 'R' and city 'S' together = 24 + 63 = 87

The total number of female employees working in the 'private' sector from city 'R' and city 'S' together = 87 - 40 = 47

Hence, the correct answer is 47.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 853

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

Directions: Answer the questions based on the information given below.

The table given below shows the total number of male employees (Public + Private) and the total number of female employees (Public + Private) working in five different cities.

Total number of employees in a city = Number of male employees working in the city + Number of female employees working in the city

CityNumber of male employeesTotal Number of female employees
PublicPrivate
P3x + 2y14y48
Q8x6x48
R5x2x24
S12y8163
T36y28y48

Note:

(1) Sum of the total number of male employees working in the 'Public' sector from city 'P' and city 'R' together is 70. (2) Sum of the total number of male employees working in the 'Private' sector from city ''Q' and city 'T' together is 132.

If the total number of employees (male + female) working in city 'Z' is 60% less than the total number of employees working in all five cities together and the total number of male employees (public + private) working in city 'Z' is 8 more than that of female employees then the total number of male employees (public + private) working in city 'Z' is what percentage that of city T'?

  1. AOption (a)

    80%

  2. BOption (b)

    83.33%

  3. COption (c)

    85%

  4. DOption (d)

    86.66%

  5. EOption (e)

    88%

View answer & explanation

Correct answer

Answer: (b)B.

83.33%

Why this answer is correct

Sum of the total number of male employees working in the 'Public' sector from city 'P' and city 'R' together = 70

ATQ, (3x + 2y) + 5x = 70

⇒ 8x + 2y = 70

⇒ 4x + y = 35...(i)

Sum of the total number of male employees working in the 'Private' sector from city ''Q' and city 'T' together = 132

⇒ 6x + 28y = 132

⇒ 3x + 14y = 66...(ii)

Using (i) and (ii)

⇒ 3x + 14 × (35 - 4x) = 66

⇒ 53x = 424

⇒ x = 8

⇒ y = 35 - 4x

⇒ y = 3

Putting the value of x and y in the given table we get

CityNumber of male employeesTotal Number of female employeesNumber of male employees (Public + Private)Total Number of employees (male + female)
PublicPrivate
P3x + 2y = 3014y = 424830  + 42 = 7272 + 48 = 120
Q8x = 646x = 484864 + 48 = 11248 + 112 = 160
R5x = 402x = 162440 + 16 = 5624 + 56 = 80
S12y = 36816336 + 81 = 11763 + 117 = 180
T36y = 10828y = 8448108 + 84 = 19248 + 192 = 240

 

The total number of employees working in all five cities together = 120 + 160 + 80 + 180 + 240 = 780

The total number of employees (male + female) working in city 'Z' = 780 × 0.40 = 312

Let the number of male employees working in city 'Z' = m and the number of female employees working in city 'Z' = f

ATQ, m + f = 312 ...(i)

And, m - f = 8 ...(ii)

using (i) and (ii)

⇒ m = (312 + 8)/2 = 160

Total number of male employees (public + private) working in city 'Z' = 160

Required% = (160/192) × 100 = 83.33%

Hence, the correct answer is 83.33%.

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 854

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

The area of the circle is 2464 cm2 and the ratio of the breadth of the rectangle to radius of the circle is 6:7. If the circumference of the circle is equal to the perimeter of the rectangle, then what is the area of the rectangle.

  1. AOption (a)

    1536cm2

  2. BOption (b)

    1546cm2

  3. COption (c)

    1556cm2

  4. DOption (d)

    1566cm2

  5. EOption (e)

    1576cm2

View answer & explanation

Correct answer

Answer: (a)A.

1536cm2

Why this answer is correct

Shortcut Trick

For Area of Circle = 2464 cm2, the Radius (r) is always 28 cm and Circumference is 176 cm.

Breadth (b) = (6/7) × 28 = 24 cm.

Perimeter 2(l + 24) = 176 ⇒ l + 24 = 88 ⇒ Length (l) = 64 cm.

Area of Rectangle = 64 × 24 = 1536 cm2.

∴ The correct answer is 1536 cm2.

Alternate Method

Given: Area of circle = 2464 cm2, Ratio (b : r) = 6 : 7, Circumference = Perimeter.

Formula Used: Area = πr2; Circumference = 2πr; Perimeter = 2(l + b); Area = l × b.

⇒ πr2 = 2464

⇒ (22/7) × r2 = 2464

⇒ r2 = 2464 × (7/22) = 112 × 7 = 784

⇒ r = √784 = 28 cm

⇒ Circumference = 2 × (22/7) × 28 = 176 cm

⇒ Breadth (b) = (6/7) × 28 = 24 cm

⇒ Perimeter of Rectangle = 2(l + b) = 176

⇒ l + 24 = 88 ⇒ l = 64 cm

⇒ Area of Rectangle = 64 × 24 = 1536 cm2

∴ The correct answer is 1536 cm2.

Additional Information

Standard Circle Values

For r = 7, Area = 154, Circumference = 44. Since Area ∝ r2, if r is multiplied by 4 (r=28), Area is multiplied by 16 (154 × 16 = 2464).

Mensuration Formulas

Rectangle Perimeter = 2(Length + Breadth) and Circle Circumference = 2πr. For competitive exams, memorizing squares up to 30 is essential (√784 = 28).

IBPS PO Prelims Memory Based Paper (Held On: 23 September 2023 Shift 1) (Previous Year Paper)·Quantitative Aptitude
View full paper

Question 855

IBPS Probationary Officer (PO) 2023• Quantitative Aptitude• Quantitative Aptitude

Two cars 'M' and 'N' leave from point 'P' towards point 'Q' with car 'M' leaving 1 hour earlier than car 'N'. Both the cars travel first 100 km at 50 km/hr, next 50 km at 25 km/hr and the remaining distance at 20 km/hr. If the distance between 'P' and 'Q' is 250 km, the find the distance between car 'N' and half of the distance between points 'P' and 'Q', when car 'M' reaches point 'Q'?

  1. AOption (a)

    45 km

  2. BOption (b)

    60 km

  3. COption (c)

    75 km

  4. DOption (d)

    90 km

  5. EOption (e)

    105 km

View answer & explanation

Correct answer

Answer: (e)E.

105 km

Why this answer is correct

Shortcut Trick

Total time for Car M: (100/50) + (50/25) + (100/20) = 2 + 2 + 5 = 9 hours.

Car N starts 1 hour later, so it travels for only 9 − 1 = 8 hours when M reaches Q.

In 8 hours, Car N travels: 100 km (at 50 kmph in 2h) + 50 km (at 25 kmph in 2h) + 80 km (at 20 kmph in 4h) = 230 km.

Half distance of PQ = 250 ÷ 2 = 125 km. Required distance = 230 − 125 = 105 km.

∴ The correct answer is 105 km.

Alternate Method

Given: Total Distance = 250 km. Car M leaves 1 hour earlier than Car N.

Formula Used: Time = Distance ÷ Speed

⇒ Time taken by Car M for first 100 km = 100 ÷ 50 = 2 hours.

⇒ Time taken by Car M for next 50 km = 50 ÷ 25 = 2 hours.

⇒ Remaining distance = 250 − (100 + 50) = 100 km.

⇒ Time taken by Car M for remaining 100 km = 100 ÷ 20 = 5 hours.

⇒ Total time for Car M to reach Q = 2 + 2 + 5 = 9 hours.

⇒ Car N starts 1 hour later, so it travels for (9 − 1) = 8 hours.

⇒ Distance by Car N in 8 hours: First 2h = 100 km, Next 2h = 50 km, Remaining 4h = 4 × 20 = 80 km.

⇒ Total distance covered by Car N = 100 + 50 + 80 = 230 km.

⇒ Half of distance PQ = 250 ÷ 2 = 125 km.

⇒ Distance between Car N and mid-point = 230 − 125 = 105 km.

∴ The correct answer is 105 km.

Additional Information

Average Speed with Variable Speeds

Average Speed = Total Distance ÷ Total Time. For this journey, Avg Speed = 250 ÷ 9 ≈ 27.78 km/hr.

Relative Speed

When two objects move in the same direction, relative speed is the difference of their speeds (S1 − S2).

Time Lag Problems

If one object starts 't' hours late, its travel time is (Total Time of first object − t).

IBPS Probationary Officer (PO) 2022 Previous Year Paper·Quantitative Aptitude
View full paper

Question 856

IBPS Probationary Officer (PO) 2022• Quantitative Aptitude• Quantitative Aptitude

Directions (31-35) : Read the given line graph carefully and answer the following questions. The line graph given below shows the number of shoes of two different brands sold by a store in five different months.

MonthTotal shoes sold (Adidas + Nike)Nike shoes sold
March25001100
April22001200
May24001500
July2000800
August26001000

What is the respective ratio of number of shoes sold of Nike in April and August together to number of Adidas shoes sold in July?

Line graph showing the number of Adidas + Nike shoes and Nike shoes sold by a store in March, April, May, July, and August
  1. AOption (a)

    11: 6

  2. BOption (b)

    5: 12

  3. COption (c)

    9: 5

  4. DOption (d)

    10: 7

  5. EOption (e)

    13: 8

View answer & explanation

Correct answer

Answer: (a)A.

11: 6

Explanation not yet available.
IBPS Probationary Officer (PO) 2022 Previous Year Paper·Quantitative Aptitude
View full paper

Question 857

IBPS Probationary Officer (PO) 2022• Quantitative Aptitude• Quantitative Aptitude

Directions (31-35) : Read the given line graph carefully and answer the following questions. The line graph given below shows the number of shoes of two different brands sold by a store in five different months.

MonthTotal shoes sold (Adidas + Nike)Nike shoes sold
March25001100
April22001200
May24001500
July2000800
August26001000

Average number of Adidas shoes sold in March, April and May is how much more or less than average number of Nike shoes sold in May and August.

Line graph showing the number of Adidas + Nike shoes and Nike shoes sold by a store in March, April, May, July, and August
  1. AOption (a)

    300

  2. BOption (b)

    250

  3. COption (c)

    200

  4. DOption (d)

    150

  5. EOption (e)

    100

View answer & explanation

Correct answer

Answer: (d)D.

150

Explanation not yet available.
IBPS Probationary Officer (PO) 2022 Previous Year Paper·Quantitative Aptitude
View full paper

Question 858

IBPS Probationary Officer (PO) 2022• Quantitative Aptitude• Quantitative Aptitude

Directions (31-35) : Read the given line graph carefully and answer the following questions. The line graph given below shows the number of shoes of two different brands sold by a store in five different months.

MonthTotal shoes sold (Adidas + Nike)Nike shoes sold
March25001100
April22001200
May24001500
July2000800
August26001000

If average number of Nike shoes sold in March, April, May and June is 1400 and respective ratio of shoes sold of Adidas and Nike in June is 2: 3, then find the number of Adidas shoes sold in June month.

Line graph showing the number of Adidas + Nike shoes and Nike shoes sold by a store in March, April, May, July, and August
  1. AOption (a)

    1500

  2. BOption (b)

    1800

  3. COption (c)

    2400

  4. DOption (d)

    2000

  5. EOption (e)

    1200

View answer & explanation

Correct answer

Answer: (e)E.

1200

Explanation not yet available.
IBPS Probationary Officer (PO) 2022 Previous Year Paper·Quantitative Aptitude
View full paper

Question 859

IBPS Probationary Officer (PO) 2022• Quantitative Aptitude• Quantitative Aptitude

Directions (31-35) : Read the given line graph carefully and answer the following questions. The line graph given below shows the number of shoes of two different brands sold by a store in five different months.

MonthTotal shoes sold (Adidas + Nike)Nike shoes sold
March25001100
April22001200
May24001500
July2000800
August26001000

Total sale of store in July month by selling Adidas shoes is Rs.720000. If per unit price of Nike shoes in 20% more than that of Adidas shoes, then find the total sale of store by selling Nike shoes.

Line graph showing the number of Adidas + Nike shoes and Nike shoes sold by a store in March, April, May, July, and August
  1. AOption (a)

    Rs.436000

  2. BOption (b)

    Rs.616000

  3. COption (c)

    Rs.576000

  4. DOption (d)

    Rs.676000

  5. EOption (e)

    Rs.256000

View answer & explanation

Correct answer

Answer: (c)C.

Rs.576000

Explanation not yet available.
IBPS Probationary Officer (PO) 2022 Previous Year Paper·Quantitative Aptitude
View full paper

Question 860

IBPS Probationary Officer (PO) 2022• Quantitative Aptitude• Quantitative Aptitude

Directions (31-35) : Read the given line graph carefully and answer the following questions. The line graph given below shows the number of shoes of two different brands sold by a store in five different months.

MonthTotal shoes sold (Adidas + Nike)Nike shoes sold
March25001100
April22001200
May24001500
July2000800
August26001000

Total no. of shoes sold in March and July together is what percentage more or less than total no. of shoes sold in May.

Line graph showing the number of Adidas + Nike shoes and Nike shoes sold by a store in March, April, May, July, and August
  1. AOption (a)

    62.5%

  2. BOption (b)

    80%

  3. COption (c)

    75%

  4. DOption (d)

    87.5%

  5. EOption (e)

    60%

View answer & explanation

Correct answer

Answer: (d)D.

87.5%

Explanation not yet available.

How should I prepare for Quantitative Aptitude in IBPS Probationary Officer (PO)?

Solving previous year questions by topic helps identify recurring concepts, question patterns, and frequently asked sub-topics. Attempt each question, review the step-by-step explanation, and note down key formulas or facts for quick revision before the exam.