Official Paper

ISRO Draughtsman Civil Official Paper (Held On: 21 Apr, 2018) (Previous Year Paper)

60 questions · 90 minutes · with answers · free

Full Test (60 questions)

1

The scale of the drawing is 1.0 mm = 1.0 m, then the Representative Fraction (RF) is______

  1. ((a))

    1 ∶ 1

  2. ((b))

    1 ∶ 10

  3. ((c))

    1 ∶ 100

  4. ((d))

    1 ∶ 1000

Show Answer
Answer: ((a))

1 ∶ 1

2

When the full brick is laid with its length parallel to the face of wall is called ______

  1. ((a))

    Header 

  2. ((b))

    Stretcher 

  3. ((c))

    Facing 

  4. ((d))

    Bed 

Show Answer
Answer: ((a))

Header 

3

The scale of chords is used to measure ______

  1. ((a))

    Length 

  2. ((b))

    Radius 

  3. ((c))

    Angle 

  4. ((d))

    Diameter

Show Answer
Answer: ((a))

Length 

4

Initial setting time of cement is ______

  1. ((a))

    15 minutes

  2. ((b))

    30 minutes

  3. ((c))

    45 minutes

  4. ((d))

    60 minutes

Show Answer
Answer: ((a))

15 minutes

5

A window projecting outward from the wall of a room is termed as ______

  1. ((a))

    Panelled window

  2. ((b))

    Corner window

  3. ((c))

    Bay window

  4. ((d))

    Clerestory window

Show Answer
Answer: ((a))

Panelled window

6

The width of the steps in staircase is called_______

  1. ((a))

    Tread 

  2. ((b))

    Riser 

  3. ((c))

    Flight 

  4. ((d))

    Pitch

Show Answer
Answer: ((a))

Tread 

7

In the normal building, the minimum height of the plinth is to be given above GL is ______

  1. ((a))

    150 mm

  2. ((b))

    300 mm

  3. ((c))

    450 mm

  4. ((d))

    600 mm

Show Answer
Answer: ((a))

150 mm

8

Construction in brick wall with alternate course of headers and stretchers are called ______

  1. ((a))

    English bond

  2. ((b))

    Flemish bond

  3. ((c))

    ZigZag bond

  4. ((d))

    Diagonal bond

Show Answer
Answer: ((a))

English bond

9

Terrazzo flooring is also called ______

  1. ((a))

    Grano flooring 

  2. ((b))

    Granite flooring

  3. ((c))

    IPS flooring

  4. ((d))

    Mosaic flooring

Show Answer
Answer: ((a))

Grano flooring 

10

A tool used to check the verticality of the structure is called ______

  1. ((a))

    Spirit level

  2. ((b))

    Plumb bob

  3. ((c))

    Trowel 

  4. ((d))

    Mason's square

Show Answer
Answer: ((a))

Spirit level

11

A wall built around top of flat roof which acts as a protection wall for the users is called ______

  1. ((a))

    Protection wall

  2. ((b))

    Buttress wall

  3. ((c))

    Blast wall

  4. ((d))

    Parapet wall

Show Answer
Answer: ((a))

Protection wall

12

 A survey is being made to collect the required data for design and construction of all structures is known as:

  1. ((a))

    Mine survey

  2. ((b))

    Engineering survey

  3. ((c))

    Geological survey

  4. ((d))

    Archaeological survey

Show Answer
Answer: ((a))

Mine survey

13

Volume of a solid circular steel rod is 314.2 cubic centimeter and its diameter is 2 cm. Then its length is ______

  1. ((a))

    1 cm

  2. ((b))

    10 cm

  3. ((c))

    100 cm

  4. ((d))

    1000 cm

Show Answer
Answer: ((a))

1 cm

14

A pipe which is provided for air circulation to the drainage system is called ______

  1. ((a))

    Vent pipe

  2. ((b))

    Air pipe

  3. ((c))

    SWR pipe

  4. ((d))

    Sewage pipe

Show Answer
Answer: ((a))

Vent pipe

15

A metallic chain using in chain surveying are provided with joining many number of links and the each length link is ______

  1. ((a))

    10 cm 

  2. ((b))

    15 cm

  3. ((c))

    20 cm

  4. ((d))

    25 cm 

Show Answer
Answer: ((a))

10 cm 

16

A horizontal projection ornamentally moulded immediately below the roof (or) junction of wall and ceiling is called ______

  1. ((a))

    Frieze 

  2. ((b))

    Blocking course

  3. ((c))

    Coping 

  4. ((d))

    Cornice

Show Answer
Answer: ((a))

Frieze 

17

The process of drying timber (or) removing moisture from a freshly felled tree is called ______

  1. ((a))

    Drying moisture

  2. ((b))

    Removal of moisture 

  3. ((c))

    Tempering 

  4. ((d))

    Seasoning

Show Answer
Answer: ((a))

Drying moisture

18

An estimate which is prepared by working out the quantity of each item of work based on the drawing and finding out the total cost is called ______

  1. ((a))

    Preliminary estimate

  2. ((b))

    Detailed estimate

  3. ((c))

    Revised estimate

  4. ((d))

    Recast estimate

Show Answer
Answer: ((a))

Preliminary estimate

19

A slope provided in cross section of the road surface on both sides to drain out the rainwater is called ______

  1. ((a))

    Camber 

  2. ((b))

    Gradient 

  3. ((c))

    Super elevation

  4. ((d))

    Road drainage

Show Answer
Answer: ((a))

Camber 

20

The conversion of dry land into green development by providing grass and natural scenery of vegetation is called _____

  1. ((a))

    Landscaping 

  2. ((b))

    Grass garden

  3. ((c))

    Greenland 

  4. ((d))

    Horticulture

Show Answer
Answer: ((a))

Landscaping 

21

 The horizontal layer of mortar upon which bricks are laid in brick masonry is called ______

  1. ((a))

    Lap joint

  2. ((b))

    Bed joint

  3. ((c))

    Closer joint

  4. ((d))

    Butt joint

Show Answer
Answer: ((a))

Lap joint

22

The bricks made with cavities are known as ______

  1. ((a))

    Fire bricks

  2. ((b))

    Sand - lime bricks

  3. ((c))

    Gutter bricks

  4. ((d))

    Hollow bricks

Show Answer
Answer: ((a))

Fire bricks

23

Construction of brick wall with headers and stretchers in all layers is called _____

  1. ((a))

    English bond

  2. ((b))

    Flemish bond 

  3. ((c))

    ZigZag bond

  4. ((d))

    Diagonal bond

Show Answer
Answer: ((a))

English bond

24

The difference in levels of the outer and inner edges of the road along the length of curve is called ______

  1. ((a))

    Camber 

  2. ((b))

    Gradient 

  3. ((c))

    Super elevation

  4. ((d))

    Road drainage

Show Answer
Answer: ((a))

Camber 

25

The mass per unit volume is called ______

  1. ((a))

    Force 

  2. ((b))

    Density 

  3. ((c))

    Specific Gravity

  4. ((d))

    Centre of Gravity

Show Answer
Answer: ((a))

Force 

26

 Many types of pipes are used in water supply works in which maximum diameter of pipes are available in _______

  1. ((a))

    DI pipes

  2. ((b))

    Gl pipes

  3. ((c))

    Cl pipes

  4. ((d))

    Cement pipes

Show Answer
Answer: ((a))

DI pipes

27

The effective length of a compression member is less than three times the least lateral dimension is known as:

  1. ((a))

    Column 

  2. ((b))

    Pillar 

  3. ((c))

    Pier 

  4. ((d))

    Pedestal

Show Answer
Answer: ((a))

Column 

28

 The slope provided in the longitudinal direction of the road is called ______

  1. ((a))

    Camber 

  2. ((b))

    Gradient 

  3. ((c))

    Super elevation

  4. ((d))

    Road drainage

Show Answer
Answer: ((a))

Camber 

29

 A temporary structure having platform which is used to further raising the building construction is known as:

  1. ((a))

    Platform 

  2. ((b))

    Form work

  3. ((c))

    Support frame

  4. ((d))

    Scaffolding

Show Answer
Answer: ((a))

Platform 

30

A temporary designed structure carried out to hold the concrete in position till it sets are called _______

  1. ((a))

    Platform 

  2. ((b))

    Form work

  3. ((c))

    Support frame

  4. ((d))

    Scaffolding

Show Answer
Answer: ((a))

Platform 

31

Health faucet is to be fixed in______

  1. ((a))

    Kitchen 

  2. ((b))

    Bathroom 

  3. ((c))

    Toilet 

  4. ((d))

    Washing area

Show Answer
Answer: ((a))

Kitchen 

32

One member is placed over the other and the two are connected by means of rivets (or) weld, the joint is called:

  1. ((a))

    Butt joint 

  2. ((b))

    Lap joint

  3. ((c))

    Mortise joint

  4. ((d))

    Dove tail joint

Show Answer
Answer: ((a))

Butt joint 

33

The process by which making channel in wooden frame to receive the tongue of the other plank for making shutters is called ______

  1. ((a))

    Rebating 

  2. ((b))

    Chiseling 

  3. ((c))

    Grooving 

  4. ((d))

    Moulding

Show Answer
Answer: ((a))

Rebating 

34

The bridges constructed by two or more hanging cables in a curve shape and supporting the road way is called:

  1. ((a))

    Flying bridge

  2. ((b))

    Floating bridge

  3. ((c))

    Suspension bridge

  4. ((d))

    Boat bridge

Show Answer
Answer: ((a))

Flying bridge

35

A pictorial chart is made for construction project in item wise with the duration of time is known as _______

  1. ((a))

    Bar chart 

  2. ((b))

    Duration chart

  3. ((c))

    Time chart

  4. ((d))

    Project chart

Show Answer
Answer: ((a))

Bar chart 

36

The process of concrete (or) masonry are kept wet for at least 7 days are called ______

  1. ((a))

    wetting 

  2. ((b))

    watering 

  3. ((c))

    curing 

  4. ((d))

    seasoning

Show Answer
Answer: ((a))

wetting 

37

The process by which the exposed surface of a wooden member is covered with a thin sheet of costly type of good wood to improve its appearance is called ______

  1. ((a))

    beveling 

  2. ((b))

    veneering 

  3. ((c))

    battering

  4. ((d))

    chamfering

Show Answer
Answer: ((a))

beveling 

38

 The projection of tread above the riser in staircase are called ______

  1. ((a))

    nosing 

  2. ((b))

    mitering 

  3. ((c))

    studding

  4. ((d))

    chamfering

Show Answer
Answer: ((a))

nosing 

39

Size of the brick is ______

  1. ((a))

    230 x 110 x 76 mm 

  2. ((b))

    235 x 100 x 90 mm

  3. ((c))

    215 x 110 x 75 mm

  4. ((d))

    200 x 110 x 70 mm

Show Answer
Answer: ((a))

230 x 110 x 76 mm 

40

What is meant by PPC ?

  1. ((a))

    Pressure Packed Concrete

  2. ((b))

    Portland Packed Concrete

  3. ((c))

    Portland Pozzolana Cement

  4. ((d))

    Portland Premium Cement

Show Answer
Answer: ((a))

Pressure Packed Concrete

41

The size of the A0 size drawing sheet is ______

  1. ((a))

    900 mm x 1257 mm 

  2. ((b))

    841 mm x 1189 mm

  3. ((c))

    780 mm x 1024 mm 

  4. ((d))

    850 mm x 1078 mm

Show Answer
Answer: ((a))

900 mm x 1257 mm 

42

Find the weight of water if the water tank of size 1.00 m × 1.00 m × 1.00 m is fully filled. 

  1. ((a))

    100 kg 

  2. ((b))

    1100 kg 

  3. ((c))

    110 kg 

  4. ((d))

    1000 kg 

Show Answer
Answer: ((a))

100 kg 

43

Roof which slopes in four direction is called ______

  1. ((a))

    Lean to roof

  2. ((b))

    Gable 

  3. ((c))

    Hipped roof

  4. ((d))

    Sloped

Show Answer
Answer: ((a))

Lean to roof

44

Allowable moisture content in timber is ______

  1. ((a))

    20% 

  2. ((b))

    25%

  3. ((c))

    5%

  4. ((d))

    10%

Show Answer
Answer: ((a))

20% 

45

Wedge shaped stone at apex of arch is ______

  1. ((a))

    Key stone

  2. ((b))

    Springer 

  3. ((c))

    Quoin stone 

  4. ((d))

    Closer stone

Show Answer
Answer: ((a))

Key stone

46

A line drawn with a long section, short dash and another long section is a ______

  1. ((a))

    Hidden feature

  2. ((b))

    Centre axis

  3. ((c))

    Centre of circle

  4. ((d))

    Boundary line

Show Answer
Answer: ((a))

Hidden feature

47

Command used to make corner in circular shape is ______

  1. ((a))

    Fillet 

  2. ((b))

    Chamfering 

  3. ((c))

    Trim

  4. ((d))

    Break

Show Answer
Answer: ((a))

Fillet 

48

Short key for offset command is ______

  1. ((a))

    L

  2. ((b))

    M

  3. ((c))

    C

  4. ((d))

    O

Show Answer
Answer: ((a))

L

49

Which command convert discrete objects in Polyline?

  1. ((a))

    Union 

  2. ((b))

    Subtract 

  3. ((c))

    Polyline 

  4. ((d))

    Join

Show Answer
Answer: ((a))

Union 

50

What is meant by UCS?

  1. ((a))

    Universal CAD System

  2. ((b))

    Universal CAD Settings 

  3. ((c))

    Uniform Calculator System 

  4. ((d))

    User Coordinate System

Show Answer
Answer: ((a))

Universal CAD System

51

How many points do you need to define for rectangle command?

  1. ((a))

    One 

  2. ((b))

    Two 

  3. ((c))

    Three 

  4. ((d))

    Four

Show Answer
Answer: ((a))

One 

52

The ratio between the two adjacent sides of a drawing sheet is ______

  1. ((a))

    1:51: \sqrt{5}

  2. ((b))

    1:31: \sqrt{3}

  3. ((c))

    1:1 1 : 1

  4. ((d))

    1:21: \sqrt{2}

Show Answer
Answer: ((a))

1:51: \sqrt{5}

53

In a drawing letters and numbers are designed by their ______

  1. ((a))

    height 

  2. ((b))

    width

  3. ((c))

    thickness

  4. ((d))

    None of the above

Show Answer
Answer: ((a))

height 

54

Eccentricity is always equal to 1 for ______

  1. ((a))

    Ellipse 

  2. ((b))

    Hyperbola 

  3. ((c))

    Circle 

  4. ((d))

    Parabola

Show Answer
Answer: ((a))

Ellipse 

55

The main corrosive resisting pigment in paint is ______

  1. ((a))

    Red lead 

  2. ((b))

    Zinc oxide

  3. ((c))

    Aluminum oxide

  4. ((d))

    Ferrous oxide

Show Answer
Answer: ((a))

Red lead 

56

Lower edge of inclined roof is ______

  1. ((a))

    Eves

  2. ((b))

    Pitch 

  3. ((c))

    Gable 

  4. ((d))

    Cleat

Show Answer
Answer: ((a))

Eves

57

The inclination of stair to horizontal should be limited to ______ 

  1. ((a))

    45° to 50°

  2. ((b))

    30° to 45°

  3. ((c))

    40° to 60° 

  4. ((d))

    30° to 60°

Show Answer
Answer: ((a))

45° to 50°

58

GI Pipe has a coating of ______

  1. ((a))

    Zinc 

  2. ((b))

    Iron 

  3. ((c))

    Copper

  4. ((d))

    Carbon

Show Answer
Answer: ((a))

Zinc 

59

Upper horizontal member of a door frame is called ______

  1. ((a))

    Sill 

  2. ((b))

    Head 

  3. ((c))

    Crown 

  4. ((d))

    Frame

Show Answer
Answer: ((a))

Sill 

60

Dimensioning system used in Engineering drawing is ______

  1. ((a))

    Aligned

  2. ((b))

    Undirectional

  3. ((c))

    Notation System 

  4. ((d))

    Conventional

Show Answer
Answer: ((a))

Aligned